Lucent Technologies 555-661-140 manual Testing the Power Failure Transfer Jacks

Models: 555-661-140

1 355
Download 355 pages 10 Kb
Page 264
Image 264

MERLIN LEGEND Communications System Release 6.1

Issue 1

Installation 555-661-140

August 1998

Initializing and Testing the System

Page 7-19

Testing the System

 

 

! At the destination extension, answer the incoming call.

! At the destination extension, press the Hold button. The line button’s green LED should flash.

! Verify that music is heard at the destination extension and adjust the volume as required.

! Hang up.

NOTE:

If the customer uses equipment that rebroadcasts music or other copyrighted materials, the customer may be required to obtain a copyright license from and pay license fees to a third party such as the American Society of Composers, Artists, and Producers (ASCAP) or Broadcast Music Incorporated (BMI). Or the customer can purchase a Magic-on-Hold system, which does not require that you obtain such a license, from Lucent Technologies.

Testing the Power Failure Transfer Jacks

To test a power failure transfer (PFT) jack for proper operation, you must assign the outside line numbers to the module’s line/trunk jacks and the trunks must be operational. A PFT telephone on a GS line must have a GS button attached to the telephone. See Figure 7–1.

Page 264
Image 264
Lucent Technologies 555-661-140 manual Testing the Power Failure Transfer Jacks