Powerware Powerware 9315 operation manual Multi‐Module Installation

Models: Powerware 9315

1 154
Download 154 pages 18.66 Kb
Page 28
Image 28
3.4Multi‐Module Installation

INSTALLING THE UPS SYSTEM

NOTE Remove the entire MBC top panel to punch conduit holes.

4.Connect phase A, B, and C power wiring from the bypass source to the respective bypass inputs in the MBC.

5.Connect phase A, B, and C and Neutral power wiring from the MBC output to the critical load.

6.Connect the control wiring (battery breaker open and close signals and shunt DC disconnect) between the external battery disconnect and the UPS.

7.After wiring the UPS system to the facility power and critical load, be sure to ground the system according to local and/or national electrical wiring codes.

8.Install the batteries according to the battery and battery rack manufacturer's instructions and all applicable codes and regulations, including the National Electrical Code (NEC), Article 480.

NOTE There is no DC disconnect device within the UPS.

NOTE The DC input to the UPS is protected by internal fuses F30 and F31.

3.4Multi‐Module Installation

To install a multi‐module system using a System Bypass Module (SBM), perform the procedures in the following paragraphs.

3.4.1Installing UPS Internal Power and Control Wiring

NOTE The cables used in Steps 2 through 4 are coiled inside the Input/Rectifier cabinet and are attached at the factory to the rectifier output.

To install the UPS internal power and control wiring in a multi-module system (see

Appendix A for terminal locations and wiring access information):

1.Remove the plastic shield covering the inverter input section of the Output/Inverter cabinet.

2.Route the DC Link cables from the rectifier output (Input/Rectifier cabinet) to the inverter input (Output/Inverter cabinet) through the knockouts in the cabinet sides.

3.Connect the positive DC Link power wiring to the inverter input. Connect two cables to each inverter. For tightening torque, see Table H on page A-16.

4.Connect the negative DC Link power wiring to the inverter input. Connect two cables to each inverter. For tightening torque, see Table H on page A-16.

5.Reinstall the plastic shield to inverter input section.

6.Route the ground braid from the top of the Output/Inverter cabinet to the Input/Rectifier cabinet through the cabinet knockouts. The ground braid is secured at the factory to the Output/Inverter cabinet mounting stud.

7.Connect the ground braid to the Input/Rectifier cabinet mounting stud and secure.

3-4

EATON Powerware® 9315 UPS (500–750 kVA) Installation and Operation Manual S 164201244 Rev E www.powerware.com

Page 28
Image 28
Powerware Powerware 9315 operation manual Multi‐Module Installation, Installing UPS Internal Power and Control Wiring