INSTALLING OPTIONAL ACCESSORIES
6.3Installing an SCM
The optional SCM shown in Figure 6‐5 provides contacts for monitoring UPS system status. See Figure A‐29 page
Flush Mount
Surface Mount (for hanging)
TB2
Wires Must be Twisted
Figure 6‐5. SCM
1.Verify that the UPS system is turned off and all power sources are removed. See Chapter 9, “UPS Operating Instructions,” for shutdown instructions.
2.Remove the access plate on top of the UPS Input/Rectifier cabinet to gain access to the customer interface panel (see Figure A‐13 on page
3.Securely mount the SCM.
4.Install wiring from the SCM using ½” conduit through the cable entry knockout in the top of the UPS Input/Rectifier cabinet. See Figure A‐13 on page
5.If not already installed, locate the RMP adapter cable assembly in the spare parts kit (see Figure 6‐6). Mate the DB‐9 connector on the back of the terminal block to the DB‐9 connector (Port 1) on the UPS customer interface panel (see
Figure A‐19 on page A-30). Use two screws from the spare parts kit to secure the terminal block bracket to the customer interface panel.
EATON Powerware® 9315 UPS |