FORM | |
TABLE OF CONTENTS |
|
FIELD WIRING | 33 |
Thermostat | 33 |
Fan input | 33 |
Space Sensor | 33 |
CO2 Sensor | 34 |
Occupied / Unoccupied Input | 34 |
Shutdown Input | 34 |
Smoke Purge Input | 34 |
BAS Economizer Input | 34 |
Fault Output | 34 |
VAV Heat Relay Output | 35 |
Supply Air Temperature Reset | 35 |
COMMUNICATION | 35 |
DIRTY FILTER SWITCH | 35 |
FIELD CONTROL WIRING CONNECTIONS | 36 |
POWER WIRING | 37 |
ELECTRICAL SERVICE SIZING | 37 |
38 | |
39 | |
40 | |
CONTROLS | 41 |
TRANSDUCER PNEUMATIC TUBING | 42 |
Static Pressure Control Plastic Tubing | 42 |
Duct Static Transducer | 42 |
Building Pressure Transducer | 42 |
Static Pressure Probe Installation | 42 |
DUCT SYSTEM | 44 |
Duct Connection Guidelines | 44 |
SOUND AND VIBRATION TRANSMISSION | 44 |
GAS HEATING | 45 |
GAS PIPING | 45 |
GAS CONNECTION | 45 |
Gas Piping Recommendations | 45 |
COMBUSTION VENT | 46 |
SECTION 3 – | 47 |
CRANKCASE HEATERS | 47 |
CHECKING THE SYSTEM PRIOR TO INITIAL START (NO POWER) | 47 |
Unit Checks | 47 |
UNIT CHECKS – POWER APPLIED | 49 |
Verifying Compressor Rotation | 49 |
Compressor Oil Level Check | 49 |
JOHNSON CONTROLS | 5 |