York YPAL 060, YPAL 061, YPAL 050, YPAL 051 manual Leak Checking

Models: YPAL 060 YPAL 051 YPAL 050 YPAL 061

1 168
Download 168 pages 27.04 Kb
Page 51
Image 51

Example:

The suction pressure is 130 PSIG and the suction line temperature is 57 °F

Suction Line Temperature

= 57°F

Saturation Temperature for 130 PSIG

= 45°F

Evaporator Superheat

= 12°F

When adjusting the expansion valve, the adjusting screw should be turned not more than one turn at a time, allowing sufficient time (approximately 15 minutes) between adjustments for the system and the thermal expansion valve to respond and stabilize.

The superheat setting should be adjusted to 12°F at design conditions.

FORM 100.50-NOM6 (1207)

Leak Checking

Leak check compressors, fittings and piping to assure no leaks. Verify the evaporator distributor tubes do not have bare copper touching each other or are against a sheet metal edge. If you are leak checking a unit charged with R-410A make sure the leak test device is capable of sensing refrigerant R-410A.

If the unit is functioning satisfactorily during the initial operating period, no safeties trip and the unit controls are functioning properly, the rooftop unit is ready to be placed into operation.

3

JOHNSON CONTROLS

51

Page 51
Image 51
York YPAL 060, YPAL 061, YPAL 050, YPAL 051 manual Leak Checking