5.To ship the library, remove all external cords, cables, and terminators. For an internal move, only disconnect the power cables, SCSI cables, the RMC ethernet cable, and the Fibre Channel connection from the host, hub, or switch.

Note

You do not need to remove the SCSI cables that connect the

 

controller or the Fibre Channel controller to the drive modules,

 

unless the library is being shipped.

 

 

WARNING Before moving the library, the leveler feet must be fully raised to allow for ground clearance. Once the library is in place, the leveler feet should be fully lowered. Failure to follow these precautions could result in personal injury or damage to the library.

6.When moving a stand-alone library, raise the library’s leveler feet (for the 6/60 series library only) before moving it to its new location. Reconnect the library using the procedures in Connecting and Powering on the Library on page 32.

7.For shipping, place the library in the original packing materials. For 8/80 and 10/100 Series Libraries:

Refer to the Rack System User Manual for more information on repackaging the library. The manual is available at http://www.hp.com/ racksolutions.

Secure library components for shipping by doing the following:

Remove the filler panels from the rack

Wrap the filler panels with bubble-wrap

Secure the outer rack side panels to the rack with shrink-wrap or bands

Note

If you no longer have the original packaging, contact your sales

 

or service representative to obtain packaging materials.

 

 

— For libraries mounted in a rack, proceed to the next step.

56 Moving or Shipping the Library

Chapter 1

Page 58
Image 58
HP 20-Feb manual Or service representative to obtain packaging materials