Installing the Processor Retention Bracket

See Figure 44.

1.Observe the safety and ESD precautions at the beginning of this chapter.

2.Carefully align the processor retention bracket guideposts (larger guide on the right) with the bracket guides on the profusion carrier tray.

3.Ensure that all the guides for each mezzanine board are properly aligned. Lock the plastic mezzanine lock bars by squeezing the winged end of the plastic lock bar while simultaneously pushing in toward the profusion carrier tray. Lock all four mezzanine lock bars.

4.Push up and in on the metal latch verification brackets. All four metal latches must be in the up position before reinstalling the profusion carrier tray.

Mezzanine Board(s): Removing and Installing

Removing the Mezzanine Board(s)

See Figure 45.

1.Observe the safety and ESD precautions at the beginning of this chapter.

2.Remove the memory module (page 142).

3.Remove the profusion carrier tray (page 104).

4.Remove the processor retention bracket (page 134).

5.Remove the Mezzanine Extraction Tool/Cache Hold Down from the front of the processor retention bracket.

6.Insert the flange end (without foam) under the edge of the mezzanine board at the place marked "insert extraction tool here".

7.Using the grand connector as a fulcrum, press down on the opposite end of the tool as it lifts the rear end of the board.

8.Set the tool aside and lift on both the front edge and the rear edge of the mezzanine board to unseat it from the profusion carrier board.

Installing the Mezzanine Board(s)

CAUTION

Please follow these procedures carefully. The mezzanine board does not have a keying feature and can be installed incorrectly.

1.Prior to seating the mezzanine board onto the connector, orient the board so that the white alignment marker on the board (lower right corner) is aligned with the white alignment arrow located on the profusion carrier. The white number label will be on the left size of the mezzanine board.

2.Look under the board to ensure that it is properly aligned with the profusion carrier, and not improperly aligned with components or processor slots.

3.Push down firmly in the middle area of the mezzanine board until it’s flush with the profusion carrier.

SRPL8 Server System Product Guide

135

Page 135
Image 135
Intel SRPL8 manual Mezzanine Boards Removing and Installing, Installing the Processor Retention Bracket