Toshiba M1 manual Subtest FIR/SIR Point to Point receive

Models: M1

1 426
Download 426 pages 50.3 Kb
Page 155
Image 155

3.10 Async Test

3 Tests and Diagnostics

 

 

 

 

 

NOTE: To execute this subtest, two machines must be connected with an

 

 

RS-232C direct cable. One machine should be set as “send”(subtest 02)

 

 

and the other set as “receive” (subtest 03). The wiring diagram for the

 

 

RS-232C direct cable is described in Appendix F.

 

 

 

 

 

This subtest sends 20h through 7Eh data to the receive side, then receives the sent

 

data and compares it to the original data.

 

Subtest 03

Point to Point (receive)

 

 

This subtest is used with subtest 02 described above. This subtest receives the data

 

from the send side, then sends the received data.

 

Subtest 04

Interrupt Test

 

 

This subtest checks the Interrupt Request Level of IRQ 4, 3 and 5 from the send

 

side.

 

Subtest 06

FIR/SIR Point to Point (send)

 

 

 

 

 

 

NOTE: To execute subtests 06 and 07, each computer must have access

 

 

to the other computer’s infrared port.

 

 

 

 

 

This subtest sends 20h through 7Eh data to the receive side, then receives the sent

 

data and compares it to the original data through the FIR/SIR port.

Subtest 07

FIR/SIR Point to Point (receive)

 

 

This subtest is used with subtest 06 described above. This subtest receives the data

 

from the send side, then sends the received data through the FIR/SIR port.

TECRA M1 Maintenance Manual (960-436)

3-29

Page 155
Image 155
Toshiba M1 manual Subtest FIR/SIR Point to Point receive