
3.10 Async Test | 3 Tests and Diagnostics | ||
|
|
| |
|
| NOTE: To execute this subtest, two machines must be connected with an | |
|
| ||
|
| and the other set as “receive” (subtest 03). The wiring diagram for the | |
|
|
| |
|
|
| |
| This subtest sends 20h through 7Eh data to the receive side, then receives the sent | ||
| data and compares it to the original data. |
| |
Subtest 03 | Point to Point (receive) |
| |
| This subtest is used with subtest 02 described above. This subtest receives the data | ||
| from the send side, then sends the received data. |
| |
Subtest 04 | Interrupt Test |
| |
| This subtest checks the Interrupt Request Level of IRQ 4, 3 and 5 from the send | ||
| side. |
| |
Subtest 06 | FIR/SIR Point to Point (send) |
| |
|
|
| |
|
| NOTE: To execute subtests 06 and 07, each computer must have access | |
|
| to the other computer’s infrared port. |
|
|
|
| |
| This subtest sends 20h through 7Eh data to the receive side, then receives the sent | ||
| data and compares it to the original data through the FIR/SIR port. | ||
Subtest 07 | FIR/SIR Point to Point (receive) |
| |
| This subtest is used with subtest 06 described above. This subtest receives the data | ||
| from the send side, then sends the received data through the FIR/SIR port. |
TECRA M1 Maintenance Manual |