10

System Enhancements

Release Note

To capture data when the CPU is experiencing a specific amount of instantaneous usage, set the start and start percentages with the command:

activate cpu extended start=1..100 [stop=1..100]

When a start percentage is set, the router or switch automatically disables extended monitoring once it has 500 data entries.

To enable extended monitoring, use the command:

enable cpu extended

This command also lets you capture data immediately, without first setting start and stop percentages. This adds data entries continuously, until you stop it. Only the last 10 seconds of data entries are stored.

To stop capturing data, and reset the start and stop parameters if they are set, use the command:

disable cpu extended

To remove data entries and reset the start and stop parameters in the activate cpu extended command, use the command:

reset cpu utilisation

This command interrupts active data capturing for a specific event. However, monitoring remains enabled, and continues to collect data. This means you can capture data for a particular event without having to disable and re-enable this feature.

Command Changes

The following table summarises the new and modified commands:

Command

Change

 

 

activate cpu extended

New command.

 

 

disable cpu extended

New command.

 

 

enable cpu extended

New command.

 

 

reset cpu utilisation

Modified command.

 

 

show cpu

New extended parameter in command.

 

New output field when extended parameter is used.

 

 

Software Version 2.8.1 C613-10477-00 REV B

Page 10
Image 10
Allied Telesis AT-8900 Activate cpu extended, Disable cpu extended, Enable cpu extended, Reset cpu utilisation, Show cpu