7.While pressing down the drive gear jig, tighten 7 finger-tight screws (B) of the main drive gear assembly.

8.Loosen the wing screw, release the tab of the drive gear jig arm, and remove the drive gear jig.

9.Mount 2 screws.

10.Mount the bushing plate and tighen 2 screws.

11.Turn the main motor counterclockwise two or three times.

Screw (B)

Drive gear jig arm

Screw (B)

Drive gear jig

Fig. 1-9-5

Screw

Bushing plate

Screw

Fig. 1-9-6

Main motor

05

06

07

12. Release the jam lever of the fuser.

Fig. 1-9-7

Fuser

Jam lever

Jam lever

08

Fig. 1-9-8

December 2002 TOSHIBA TEC

1 - 87

e-STUDIO160/200/250 ADJUSTMENT ITEMS

Page 95
Image 95
Toshiba e-Studio160, e-Studio250, e-Studio200 manual Release the jam lever of the fuser