Operation

Control Charts (continued)

Precharge* - Valve 1 Mode

Automation Inputs (PCF Outputs)

Dispense Ready

Dispenser (Fluid Plate) No Alarm

Dispenser (Fluid Plate) No Error

Dispense In Process

Volume OK

Automation Outputs (PCF Inputs)

Style Bits

Style Strobe

Command Signal Valid†

Dispense Valve X On

Dispense Complete

PCF State

Regulator Active

Dispense Valve X Open

*Precharge: After starting a job and prior to opening the dispense valve, the fluid pressure is increased to try to match the dispensing pressure. This helps the consistency of the dispense.

Shaded areas indicate the precharge is active.

Only applies to command signals when either “Command Cable” or “gateway” is selected as “Com- mand Value Source”. In systems containing an automation gateway DGM, when “Digital” is selected as the “Command Value Type”, the “Digital CMD 1” and “Digital CMD 2” inputs set the command.

Trigger Using Command Cable 3x

Automation Inputs (PCF Outputs)

Dispense In Process

Automation Outputs (PCF Gateway Inputs)

Dispense Valve 1 Trigger

Dispense Valve 2 Trigger

Dispense Valve 3 Trigger

PCF State

Regulator Active (Precharge = 0)

Dispense Valve 1 Open

Dispense Valve 2 Open

Dispense Valve 3 Open

54

3A2098H

Page 54
Image 54
Graco 3A2098H important safety instructions Precharge* Valve 1 Mode, Trigger Using Command Cable