Maintenance

5.After the red indicator light shuts off, turn off power to the system.

6.Remove token.

7.Replace access cover.

4.Press and hold the push button for three seconds and then release. The red indicator light (CK) will flash twice, pause, and then once after the data map is uploaded.

Upgrade Gateway Module Fieldbus Map

NOTE: The fieldbus connection is temporarily disabled during the use of a map token. The following instructions apply to all Gateway modules.

1.Perform Upgrade Gateway Module Software. Software must be upgraded before upgrading the fieldbus map.

2.Remove the access cover.

Access

Cover

TI12319A

FIG. 45: Remove Access Cover

3. Insert and press map token firmly into slot.

NOTE: There is no preferred orientation of the token.

CK

 

TI12320A

Token

Push Button

FIG. 46: Insert Token

 

 

 

5.Remove map token (CC) when software has suc- cessfully uploaded.

6.Replace access cover.

78

3A2098H

Page 78
Image 78
Graco 3A2098H important safety instructions Upgrade Gateway Module Fieldbus Map