Using the BayStack 350 10/100/1000 Series Switch

Verifying the Installation Using the LEDs

To verify the installation using the LEDs, check that the switch power-up sequence is as described in Table 2-1:

Table 2-1. Power-Up Sequence

Stage Description

LED indication

1Immediately after AC power is applied to the switch, DC power is available to the switch’s internal circuitry.

The Power LED turns on within 5 seconds (Figure 2-9).

If the Power LED does not turn on, verify that power is available at the AC power outlet and that the power cable is fastened securely at both ends.

If the Power LED remains off, contact the sales agent or the customer service representative from whom you purchased the switch.

2

The switch initiates

As subroutines are initiated by the self-test, the port status

 

a self-test.

LEDs flash various patterns. When the switch passes the

 

 

self-test (within 10 seconds), the Status LED turns on

 

 

(Figure 2-9).

If a nonfatal error occurs during the self-test, the Status

LED blinks.

If the switch fails the self-test, the Status LED remains off. Contact the sales agent or the customer service representative from whom you purchased the switch.

Power LED

Status LED

BayStack 350-24T Switch

 

 

 

1

 

3

 

5

 

7

 

9

 

11

13

 

15

 

17

 

19

 

21

 

23

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

10/100

Pwr

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Activity

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Status

2

 

4

 

6

 

8

 

10

 

12

14

 

16

 

18

 

20

 

22

 

24

 

10/100

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Activity

BS35040A

Figure 2-9. Observing LEDs to Verify Proper Operation

2-14

304376-B Rev 00