Nortel Networks 350 manual Verifying the Installation Using the Self-Test Screen

Models: 350

1 248
Download 248 pages 44.9 Kb
Page 107
Image 107

Installing the BayStack 350 Switch

Verifying the Installation Using the Self-Test Screen

If a monitor is connected to the switch (see “ Connecting the Console/Comm Port” on page 2-10), you can observe the BayStack 350 switch Self-Test screen (Figure 2-10).

The results of the self-test are displayed briefly (5 or 10 seconds) in the Self-Test screen, which is followed by the Bay Networks logo screen (Figure 2-11).

Note: The Self-Test screen remains displayed only if the self-test detects a fatal error.

BayStack 350 Self-Test

 

CPU RAM test

... Pass

ASIC addressing test

... Pass

ASIC buffer RAM test

... Pass

Port internal loopback test ... Pass

Self-test complete.

Figure 2-10. BayStack 350 Switch Self-Test Screen

304376-B Rev 00

2-15

Page 107
Image 107
Nortel Networks manual Verifying the Installation Using the Self-Test Screen, BayStack 350 Switch Self-Test Screen