
Preinstallation checklist | Standard 1.0 |
Preinstallation checklist
Introduction
The following checklist includes a list of required and optional components for the switch, the network and router system, and the CPE. Nortel Networks recommends that you complete the checklist before attempting to configure the switch for Symposium Call Center Server.
DMS Components
Component | Required | Optional | Description |
|
|
|
|
Yes |
| Centrex Switch | |
500 |
|
|
|
|
|
|
|
LPP Frame, LIM, and LIS | Yes |
| Link Peripheral Processor |
|
|
| Frame, Link Interface |
|
|
| Module, and Link Interface |
|
|
| Shelf. This is where the |
|
|
| EIU resides. |
|
|
|
|
NTEX22BB | Yes |
| (EIU Front) Integrated |
|
|
| Processor and |
|
|
|
|
NT9X84AA | Yes |
| Ethernet Interface Card |
|
|
|
|
NT9X85AA | Yes |
| (EIU Back) Ethernet |
|
|
| Interface |
|
|
| Paddleboard |
|
|
|
|
NT9X0190 | Yes |
| AUI Bulkhead Cable |
|
|
|
|
MAU | Yes |
| Ethernet AUI to |
|
|
| Transceiver |
|
|
|
|
112 | Symposium Call Center Server |