
April 2004 | Gettingstarted |
Preinstallation checklist
Completing a preinstallation checklist
Before attempting to configure the switch for Symposium Call Center Server, Nortel Networks recommends that you complete a checklist of the required and optional components for the switch, the network and router system, and the CPE. For information about completing the checklist, refer to the example in Appendix A, “Preinstallation checklist” on page 112.”
Symposium and | 31 |