7. Operation and Maintenance

Table 7-6. Device Messages (2 of 6)

Message

What It Indicates

What To Do

 

 

 

Duplicate DLCI

DLCI number entered is not

No action needed; previous

Number

unique for the frame relay

contents of the DLCI number field

 

link.

is restored.

 

 

 

File Transfer Complete

A file transfer was

Switch to the newly downloaded

(Seen at an FTP

performed successfully.

software.

 

 

terminal.)

 

See Changing Software on

 

 

page 7-79.

 

 

 

File Transfer Failed –

A file transfer was

Try again, making sure you

Invalid file

attempted, but it was not

Ttype the filename correctly.

(Seen at an FTP

successful.

Exit the FTP session, or

 

terminal.)

 

download another file.

 

 

See Changing Software on

 

 

page 7-79.

 

 

 

Invalid – Already

A test was already in

No action needed.

Active

progress when it was

 

 

selected.

 

 

 

 

Invalid Character (x)

A non-valid printable ASCII

Reenter information using valid

 

character has been

characters.

 

entered.

 

 

 

 

Invalid date: must be

A non-valid date was

Reenter the date in the

mm/dd/yyyy

entered on the System

month/day/4-digit year format.

 

Information screen.

 

 

 

 

Invalid date and/or

A non-valid date or time

Reenter the date in the

time

was entered on the System

month/day/4-digit year format

 

Information screen. The

and/or time in the

 

date does not exist (e.g.,

hour:minutes:seconds format.

 

February 30th).

 

 

 

 

Invalid – Link Already

Start was selected for a

Wait until the link is available and

Active

Test Call, but the selected

try again.

 

frame relay link is currently

 

 

in use.

 

 

 

 

Invalid – No ISDN

Start was selected for a

Wait until a channel is available

Channels Available

Test Call, but all supported

and try again.

 

ISDN channels are

 

 

currently in use.

 

 

 

 

Invalid – No Test Call

Stop was selected for a Test

Start the Test Call again when the

Active

Call and no test call is

connection is Inactive again.

 

active on the selected link.

 

 

This can occur when the

 

 

test is ended because the

 

 

link is needed for an active

 

 

connection, but the PVC

 

 

Test screen has not yet

 

 

been updated to Start.

 

 

 

 

Invalid time: must be

A non-valid system time

Reenter the time in the

hh:mm:ss

was entered on the System

hour:minutes:seconds format.

 

Information screen.

 

 

 

 

9128-A2-GB20-80

September 2002

7-13

Page 195
Image 195
Paradyne CSU, DSU, 9126-II, 9128-II manual Device Messages 2 What It Indicates What To Do, See Changing Software on