Paradyne 9126, CSU, DSU PVC Backup Over the Network Interface, Setting Up Back-to-Back Operation

Models: CSU, DSU 9126 9126-II 9128-II

1 470
Download 470 pages 16.65 Kb
Page 63
Image 63

4. Configuration Options

PVC Backup Over the Network Interface

Generally, backup can be performed on the network interface’s frame relay link using a backup PVC, as well on an ISDN link; the unit does not have to have the ISDN DBM feature.

In this case, create a DLCI Record on the network interface that will be used for backup, then modify the PVC Connections or Management PVCs to add the alternate destination.

Setting Up Back-to-Back Operation

Using this special feature, you can set up two FrameSaver units that are connected back-to-back without frame relay switches between them, as in a test bench setup using a crossover cable.

Changing Operating Mode

When setting up back-to-back operation:

One unit must be configured for Standard operation, which is the setting for

Tnormal operation.

The other unit must be configured for Back-to-Back operation so it presents the network side of the UNI (user-network interface).

Only one of the units will have its operating mode changed.

Procedure

To set up back-to-back operation:

1.On the unit to be configured for Back-to-Back operation, manually configure DLCIs; DLCIs should be configured before connecting the two units.

2.Access the Change Operating Mode screen.

Main Menu ControlChange Operating Mode

3.Select Back-to-Back Operation, and respond Yes to the Are you sure? prompt.

4.Save the change.

Procedure

To return the unit to normal operation:

1.Return to the Change Operating Mode screen and switch back to Standard Operation.

2.Respond Yes to the prompt and save the change. The units can be reconnected to a standard frame relay network.

9128-A2-GB20-80

September 2002

4-19

Page 63
Image 63
Paradyne 9126, CSU, DSU PVC Backup Over the Network Interface, Setting Up Back-to-Back Operation, Changing Operating Mode