SNC 5100

 

 

 

 

 

 

 

Table 4-1: Post-Repair Checklist

 

 

 

 

 

 

 

 

 

Step

 

Actions

 

Comments and References

 

 

 

 

 

 

 

 

 

 

 

 

 

 

8

Perform the following:

 

This step must be performed if you replaced the SNC

 

 

 

Start the ADIC

 

5100

 

 

 

 

Management

 

For more information, see the ADIC Management

 

 

 

 

Console Server and

 

 

 

 

 

Client.

 

Console User Guide.

 

 

 

Log on with

 

 

 

 

 

 

administrator

 

 

 

 

 

 

privileges.

 

 

 

 

 

• Connect to the SNC

 

 

 

 

 

 

5100.

 

 

 

 

 

If you downloaded

 

 

 

 

 

 

new operating

 

 

 

 

 

 

software in Step 5 of

 

 

 

 

 

 

“Updating the SNC

 

 

 

 

 

5100” on page 90,

 

 

 

 

 

 

update the

 

 

 

 

 

 

firmware.

 

 

 

 

 

Load the

 

 

 

 

 

 

configuration file

 

 

 

 

 

 

you saved in Step 1

 

 

 

 

 

 

of “Before

 

 

 

 

 

 

Removing or

 

 

 

 

 

 

Replacing the Unit”

 

 

 

 

 

 

on page 82 into the

 

 

 

 

 

 

SNC 5100.

 

 

 

 

 

Restart the SNC

 

 

 

 

 

 

5100.

 

 

 

 

 

 

 

 

 

 

9

Reconnect the FC cables

 

If FC1 and/or FC2 Connection Status LEDs for the

 

 

 

or, if you turned off the

 

attached hosts are not on, check the FC cables.

 

 

 

FC hosts, turn them back

 

 

 

 

 

on.

 

You may have to change the polarity of the FC cables.

 

 

 

 

 

 

If the problem persists, go to “Start MAP” on page 42.

 

 

 

 

 

 

 

 

92 Post-Repair Checklist

6-00020-02

Page 100
Image 100
ADIC Scalar 1000, SNC 5100 manual Start the Adic