SNC 5100

Table 3: Installation Checklist

Step

Actions

Comments and References

 

 

 

11

Configure the Ethernet Port (Host Name,

If you are using the ADIC Management

 

Address, Routes, reboot).

Console, you must configure an Ethernet

 

 

environment.

 

Observe Ethernet Link LED.

 

 

 

For more information, see the ADIC

 

 

Management Console User Guide

 

 

Configure the Ethernet Port using

 

 

information in Step 6 in Table 2:

 

 

Pre-Installation Checklist.

 

 

Refer to “Network Setup for the SNC

 

 

5100” on page 87.

 

 

If the Ethernet Link LED is not on, go to

 

 

“Ethernet MAP” on page 69.

 

 

 

12

Issue hostTypeShow command from

See the "hostTypeShow" command

 

the service terminal to view host type

 

settings for the Fibre Channel ports.

on page 138.

 

If the hosts that will be connected are not

See the "setHost [port],“OS”"

 

the type shown, issue setHost

command on page 162.

 

command from the service terminal to

 

 

set the host type for each Fibre Channel

 

 

port.

 

 

 

 

13

Power down the FC host(s).

If the FC1 and/or FC2 Connection Status

 

 

LED for the attached host(s) is not on,

 

Connect the FC cables from the FC

check FC cables. You may have to change

 

HBA(s) to the SNC 5100.

the polarity of the FC cables. If the

 

 

problem persists, go to “Fibre Channel

 

Power up the FC host(s).

MAP” on page 61.

 

 

 

14

Issue the fcShow command from the

See the "fcShow [level]"

 

service terminal to show the status of the

command on page 127.

 

FC interface that is installed and

 

 

connected.

Look for FW State=Ready for each FC

 

 

interface. If FW State NOT=Ready, go to

 

Issue fcShowDevs command from the

“Fibre Channel MAP” on page 61.

 

service terminal to show SCSI target

 

 

devices that are connected as seen by the

See the "fcShowDevs" command on

 

Fibre Channel interface.

page 129. If all devices are not shown, go

 

 

to “SCSI Channel MAP” on page 50.

 

 

 

22 Installation Procedure

6-00020-02

Page 30
Image 30
ADIC Scalar 1000, SNC 5100 manual See the setHost port,OS