SNC 5100

Post-Repair Checklist

It is important that the items in this checklist are verified after you have completed a repair action. This ensures a successful reinstall of the product.

Table 4-1: Post-Repair Checklist

Step

Actions

Comments and References

 

 

 

 

 

 

1

Reinstall the SNC 5100

See “Replacing the SNC 5100” on page 84

 

in its original location.

 

 

 

 

2

Ensure that the FC hosts

If you cannot turn off the FC hosts you must

 

are turned off. if not,

disconnect the FC hosts before turning on the SNC

 

disconnect the FC cables

5100. This is a safety precaution that ensures that FC

 

now.

hosts cannot perform any I/O to the SCSI target

 

 

devices prior to restoring the SNC 5100 configuration

 

 

in step 8, below.

 

 

 

3

Attach the Service

None.

 

Terminal to the SNC

 

 

5100

 

 

 

 

4

Turn on the SNC 5100.

None.

 

 

 

5

Wait for the SNC 5100

Within one minute, the Ready LED should start

 

to finish booting.

flashing once per second and the “Done executing

 

 

startup script” message should be displayed on the

 

 

service terminal.

 

 

If not, go to “Start MAP” on page 42.

 

 

 

6

From the service

See “Service Port Command Reference” on page 105.

 

terminal, enter the

If all attached SCSI devices are not shown, go to

 

targets command.

“Start MAP” on page 42.

 

 

 

7

If you replaced the SNC

Obtain the network parameters.

 

5100, configure the

 

 

network parameters.

 

 

 

 

Post-Repair Checklist

91

6-00020-02