SNC 5100

Step 3. If the test passes, remove the loop back plug and go to "Test SCSI Port 1 and 2".

If the test does not pass, go to “Start MAP” on page 42.

Test SCSI Port 1 and 2

Step 1. Attach the appropriate VHDCI cable between SCSI 1 and 2.

Step 2. From the service terminal, enter the scsiChannelTest 1,2 command.

For more information, see the "scsiChannelTest (x,y)" command on page 193.

Step 3. If the test passes, remove the loop back cable and go to "Test SCSI Port 1 and 2".

If the test does not pass, go to “Start MAP” on page 42.

Test SCSI Port 3 and 4

Step 1.

Attach the appropriate VHDCI loop back cable between SCSI 3

 

and SCSI 4.

Step 2.

From the service terminal, enter the scsiChannelTest 3,4

 

command.

 

For more information, see the "scsiChannelTest (x,y)"

 

command on page 193.

Step 3.

If the test passes, remove the loop back cable and go to "Ethernet

 

Test".

 

If the test does not pass, go to “Start MAP” on page 42.

Ethernet Test

For further information about the procedures and commands used in this section, see “Connecting to the Service Port” on page 95 and “Diagnostic Command Reference” on page 187.

86 Final Diagnostic Tests

6-00020-02

Page 94
Image 94
ADIC Scalar 1000, SNC 5100 manual Ethernet Test, Test Scsi Port 1, Test Scsi Port 3