Maintenance
24.Enter: boot
This reboots the system so that it recognizes the new HSI/P cards.
Note:
Sometimes the system fails to recognize a newly installed HSI card. If this happens, the command
25.When the system comes back up, log in as root.
26.Enter: cfgadm
This displays the PCI card configuration after you add the card. Make sure that the new card is displayed.
27.Continue with Installing HSI/P software and patches on page 88.
Installing HSI/P software and patches
Use the following procedures in the CMS software installation, maintenance, and troubleshooting document to:
●Install the HSI/P software
●Reinstall the Solaris patches
After installing the software and patches, continue with Setting up the switch link for each ACD on page 88
Setting up the switch link for each ACD
To change the switch link administration for each ACD:
1.Enter: cmssvc
The CMS Services menu is displayed.
2.Select the run_cms option.
3.Turn off CMS.
4.Enter: cmssvc
The CMS Services menu is displayed.
88 Avaya CMS Sun Fire V880 Computer Hardware Installation, Maintenance, and Troubleshooting