NovaJet 800 Series Service Manual

be connected between the upper parallel centronics port and the lower (network box) parallel port.

Figure 4-109. E-Connect LEDs.

Figure 4-110. Semi-Circular Nook Test Pattern.

To activate an E-Connect TEST:

Quickly depress the test key with a pen tip or other small blunt tool. DO NOT DEPRESS LONGER THAN 2 SECONDS AS THIS WILL CHANGE THE SERVER CONFIGURATION. The printer will print a Semi-Circular Nook test pattern which will verify the E-Connect print server network box and parallel ports are working properly.

Troubleshooting 4-99

Page 198
Image 198
Kodak 800 SERIES service manual To activate an E-Connect Test, E-Connect LEDs