NovaJet 800 Series Service Manual
Assembly\Disassembly 5-53
10 . Reinsert the right Foam Block. Make sure that the S tepper Motor and
Fan(s) cables are exiting out of the back corner of the Foam Block.
See Figure 5-31. The Foam Block is positioned between the S tepper
Motor and the Servo Motor . Make sure it is not tilted at an angle.
SERVICE
STATION
STEPPER
MOTOR
P/O LEG HARNESS
FOAM
BLOCK
Figure 5-31. Inside Platen, Right Side.
1 1. Reinsert the Service Station.
12 . Reinstall the Right Sideplate. Ensure that all cables from inside the
Platen are exiting out of the large hole in the Sideplate.
13 . Reinstall the left Foam Block.
14 . Reinstall the Lef t Frame Assembly .
15. Install the Ink Delivery System following procedures outlined earlier in
this chapter .
16. Install the Top, Left and Right Covers following procedures outlined
earlier in this chapter .