ITG Engineering Guidelines Page 103 of 378
ITG Trunk 2.0 ISDN Signaling Link (ISL) Description, Installation and Operation
To complete this exercise, total the traffic flow from ev ery site pair to calculate the load on each r o uted and loaded to the link.
Figure 13
Calculate network load with ITG traffic
R1
R6
R3
R7
R2
Richardson
Santa Clara
Tokyo
Ottawa
Santa Clara/Richardson traffic 60 CCS
Ottawa/Tokyo traffic 18 CCS
Santa Clara/Tokyo 15 CCS
R4 R5
ITG Node
Router 553-9178