
Chapter 2
Installing the ANH-8/DC
This chapter describes how to install the
Danger: Due to
Topics in this chapter include:
•Preparing for Installation
•Installing the
•Connecting Communications Cables
•Connecting a Management Console or Modem
•Connecting to the DC Power Source
For information on how to install the AN/DC, see Chapter 1. For technical specifications and an overview of the
Preparing for Installation
To prepare for installation, complete the steps in the next sections to verify that:
•Your shipment is complete and undamaged.
•You have the proper equipment and tools.
•The installation location meets all site requirements.