Chapter 7 NPE-G1 and NPE-G2 Installation and Configuration Information

Removing the Network Processing Engine

Figure 7-4 Removing the Strain-Relief Cover from a Cisco uBR7246VXR Router DC-Input Power Supply

1 2

3

4

5

7

6

8

9

66408

1

Power switch

6

–V lead

 

 

 

 

2

Power receptacle

7

+V lead

 

 

 

 

3

Captive screw

8

Strain-relief cover

 

 

 

 

4

M5 grounding receptacles

9

M4 nuts and studs

 

 

 

 

5

M5 grounding lug

 

 

 

 

 

 

Step 4 Using a 3/16-inch flat-blade screwdriver, loosen the screw below the +V lead receptacle and pull the lead from the connector. Repeat this step for the –V lead only. See Figure 7-5.

Network Processing Engine and Network Services Engine Installation and Configuration

7-14

OL-4448-12

 

 

Page 100
Image 100
Cisco Systems NPE-225, NPE-175 manual 66408