Chapter 9 Removing and Installing the NPE or NSE

Removing and Replacing the NPE or NSE

Step 5 Observe the initialization process. When the system boot is complete (a few seconds), the network processing engine or network services engine begins to initialize the port adapters and the I/O controller. During this initialization, the LEDs on each port adapter behave differently (most flash on and off). The enabled LED on each port adapter and Cisco uBR7200 series cable interface line card goes on when initialization is completed, and the console screen displays a script and system banner similar to the following:

Cisco Internetwork Operating System Software

IOS (tm) 7200 Software (C7200-J-M), 11.3(2)T

Copyright (c) 1986-1998 by cisco Systems, Inc.

Compiled Sun 22-Feb-98 06:00 by Biff

This completes the procedures for connecting input power and powering up the router. This also completes the procedure for installing the network processing engine or network services engine in a Cisco 7200 series router, Cisco 7200 VXR router, or Cisco uBR7200 series router.

Network Processing Engine and Network Services Engine Installation and Configuration

9-34

OL-4448-12

 

 

Page 204
Image 204
Cisco Systems NPE-225, NPE-175 manual OL-4448-12