Installing the NPE-G1 or NPE-G2

You have finished installing the cable-management brackets. Go to the “Reconnecting Input Power and Powering Up the Router” section on page 7-35.

Installing the Default Cable-Management Bracket on a Cisco uBR7246VXR Router (Optional)

If you are not using the NPE-G1 cable-management bracket, you can alternatively use two cable-management bracket configurations for the Cisco uBR7246VXR router. In the first configuration, for a 4-post rack, the rack-mount brackets are installed at the rear of the chassis and the cable-management bracket is installed at the right front of the chassis. (See Figure 7-22.) You must install both sets of brackets before you install the chassis in the rack.

In the second configuration, for a telco-type rack, the rack-mount brackets are installed at the middle of the chassis and the cable-management bracket is installed at the right front of the chassis. (See Figure 7-23.) You must install both sets of brackets before you install the chassis in the rack.

Note The cable-management bracket must be installed on the right side of the chassis when viewed from the front.

Figure 7-22 Installing the Chassis in a 4-Post Rack with an Installed Cable-Management Bracket

1

93812

2

1

Rack-mount bracket

2

Cable-management bracket

Network Processing Engine and Network Services Engine Installation and Configuration

7-34

OL-4448-12

 

 

Page 120
Image 120
Cisco Systems NPE-225, NPE-175 manual Rack-mount bracket Cable-management bracket