Chapter 7 NPE-G1 and NPE-G2 Installation and Configuration Information

Installing the NPE-G1 or NPE-G2

Warning Before completing any of the following steps, and to prevent short-circuit or shock hazards, ensure that power is removed from the DC circuit. To ensure that all power is OFF, locate the circuit breaker on the panel board that services the DC circuit, switch the circuit breaker to the OFF position, and tape the switch handle of the circuit breaker in the OFF position. Statement 322

Warning When installing the unit, the ground connection must always be made first and disconnected last. Statement 42

Step 1 At the rear of the router, check that the power switch on the power supply is in the off (O) position.

Step 2 Ensure that no current is running through the –V and +V leads. To ensure that all power is off, locate the circuit breaker on the panel board that services the DC circuit, switch the circuit breaker to the off position, and tape the switch handle of the circuit breaker in the off position.

Figure 7-27 Connecting DC-Input Power to a Cisco 7200 VXR Router

 

1

 

66432

2

3

 

4

1

2

Power switch

3

Cable tie

Ground lead service loop

4

DC power leads

 

 

 

Step 3 If necessary, use a wire stripper to strip approximately 0.55 inch (14 mm) from the –V, +V, and ground leads. (See Figure 7-28.)

Network Processing Engine and Network Services Engine Installation and Configuration

 

OL-4448-12

7-39

 

 

 

Page 125
Image 125
Cisco Systems NPE-175, NPE-225 manual Connecting DC-Input Power to a Cisco 7200 VXR Router