8-2
Network Processing Engine and Network Services Engine Installation and Configuration
OL-4448-12
Chapter 8 Preparation for Installation
Software and Hardware Requirements
If your router is mounted in a 4-post or telco-type rack, make sure you have at least one other person
available to assist you with removing the chassis from the rack.
Software and Hardware Requirements
The network processing engine and network services engine have different requirements for both
hardware and software. See the “NPE or NSE Requirements” section on page 8-2.
Note Cisco IOS Release 12.2 changed the behavior of the ROM monitor (ROMmon) during the bootup
sequence. See “Boot Changes in Cisco IOS Release 12.2” section on page 10-2 for more information.

NPE or NSE Requirements

When installing an NPE-175, NPE-225, NPE-300, NPE-400, NPE-G2, or NSE-1 in a Cisco 7200 VXR
router or Cisco uBR7246VXR router that is using a previously purchased I/O controller, you must
upgrade the I/O controller boot helper image. The Cisco uBR7225VXR router does not support port
adapters or I/O controllers.
Note Instructions for upgrading the boot helper image on the I/O controller are contained in the online
Memory Replacement Instructions for the Network Processing Engine or Network Services Engine and
Input/Output Controller publication.
Figure 8-1 Input/Output Controller—Showing Boot ROM and Flash SIMM
1Temperature sensor 7Console port
2Captive installation screw 8Midplane connectors
3PC Card slots 9Flash SIMM (U99)
4Optional Fast Ethernet port (MII receptacle) 10 NVRAM (U41)
5LEDs and CPU reset button 11 Temperature sensor
6Auxiliary port 12 Boot ROM (U20)
MII
EN
RJ45
LINK
66425
AUX
CONSOLE
PCMCIA
EJECT
SLOT 0
SLOT 1
FE MII
FAST ETHERNET INPUT/OUTPUT CONTROLLER
FE ENABLE
FE LINK
CPU RESET
IO PWR OK
ENABLED
2
8
9
11
12
10
1

4 5 763