Chapter 7 NPE-G1 and NPE-G2 Installation and Configuration Information

Installing the NPE-G1 or NPE-G2

Figure 7-23 Installing the Chassis in a Telco-Type Rack with an Installed Cable-Management Bracket

1

1

2

93812

 

Rack-mount bracket

 

2 Cable-management bracket

Reconnecting Input Power and Powering Up the Router

The following procedures explain how to reconnect input power to a Cisco 7200 VXR router, Cisco UBR7225VXR, or Cisco uBR7246VXR router, power up the router, and verify a successful system boot.

Warning Read the installation instructions before you connect the system to its power source. Statement 10

Reconnecting AC-Input Power to the Cisco 7200 VXR Router

To reconnect AC-input power to a Cisco 7200 VXR router, complete the following steps:

Step 1 At the rear of the router, check that the power switch on the power supply is in the off (O) position.

Step 2 Slide the cable-retention clip up away from the AC receptacle, and plug in the power cable.

Step 3 Secure the cable in the power supply AC receptacle by sliding the cable-retention clip down until it snaps around the connector. The cable-retention clip provides strain relief for the AC power cable.

Network Processing Engine and Network Services Engine Installation and Configuration

 

OL-4448-12

7-35

 

 

 

Page 121
Image 121
Cisco Systems NPE-175, NPE-225 manual Reconnecting Input Power and Powering Up the Router