![](/images/new-backgrounds/1158790/158790223x1.webp)
HDDs and accessible drives
7.11.4 Concluding steps
Perform the following procedures to complete the task:
ÊFollow all procedures described in section "Closing the server" on page 54.
7.12Removing 5.25-inch dummy cover
Upgrade and Repair Units (URU)
Average task duration: 5 minutes
7.12.1 Required tools
●Preliminary and concluding steps:
●Removing the dummy cover:
7.12.2 Preliminary steps
Before removing the dummy cover, perform the following steps:
ÊFollow all procedures described in section "Opening the server" on page 48.
112 | Upgrade and Maintenance Manual | MX130 S2 |