![](/images/new-backgrounds/1158790/158790181x1.webp)
HDDs and accessible drives
7.4.4Concluding steps
Perform the following procedures to complete the task:
ÊClose the front cage as described in section "Closing the front cage" on page 53.
ÊFollow all procedures described in section "Closing the server" on page 54.
7.5Installing additional 3.5-inch HDD in 3.5- inch chassis bay
Upgrade and Repair Units (URU)
Average task duration: 5 minutes
7.5.1Required tools
●Preliminary and concluding steps:
●Installing a
– Phillips PH2 / (+) No. 2 screw driver
7.5.2Preliminary steps
Before installing a
ÊFollow all procedures described in section "Opening the server" on page 48.
ÊOpen the front cage as described in section "Opening the front cage" on page 52.
ÊLocate the correct drive bay as described in section "Mounting order" on page 82.
MX130 S2 | Upgrade and Maintenance Manual | 91 |