Front panel and front USB

13.1Replacing the front panel indicators

The On/Off button and the HDD activity LED are part of the front panel module.

Field Replaceable Units (FRU)

Average task duration: 15 minutes

13.1.1 Required tools

Preliminary and concluding steps: tool-less

Replacing the front panel module: tool-less

13.1.2 Preliminary steps

ÊFollow all procedures described in section "Opening the server" on page 48.

ÊOpen the front cage as described in section "Opening the front cage" on page 52.

224

Upgrade and Maintenance Manual

MX130 S2

Page 224
Image 224
Fujitsu MX130 S2 manual Replacing the front panel indicators, Front panel and front USB