Basic hardware procedures

4.6Switching on the server

VCAUTION!

Before switching on the server, make sure the server cover is closed. In order to comply with applicable EMC regulations (regulations on electromagnetic compatibility) and satisfy cooling requirements, the PRIMERGY MX130 S2 server must not run while the server cover is removed.

Follow the safety instructions in chapter "Important information" on page 31.

ÊConnect all peripheral cables to the rear connector panel of the server.

ÊConnect the power cord as described in section "Connecting the server to the mains" on page 55.

ÊConnect the power cord to the power outlet.

Figure 13: Power button on the front panel

ÊPress the On / Off button to start up the server (1).

ÊEnsure that the power-on indicator in the On / Off button is lit green.

IFor more information see "Front panel and front USB" on page 223.

58

Upgrade and Maintenance Manual

MX130 S2

Page 58
Image 58
Fujitsu MX130 S2 manual Switching on the server, Basic hardware procedures