Before you start
2.2Average task duration
Average task duration: 10 minutes
The average task duration including preliminary and concluding steps is indicated at the beginning of each procedure next to the procedure class.
Refer to table 1 on page 26 for an overview of steps taken into account for calculating the average task duration:
Step | included | Explanation | |
|
|
| |
|
| Shutdown time depends on hardware and | |
Server shutdown | no | software configuration and may vary | |
|
| significantly. | |
|
|
| |
Disassembly | yes | making the server available | |
|
|
| |
|
| Transporting the server to the service table | |
Transport | no | (where required) depends on local | |
|
| customer conditions. | |
Maintenance | yes | maintenance procedures including | |
procedures | preliminary and concluding software tasks | ||
| |||
|
|
| |
|
| Returning the server to its installation site | |
Transport | no | (where required) depends on local | |
|
| customer conditions. | |
|
|
| |
Assembly | yes | reassembling the server | |
|
|
| |
|
| Booting time depends on hardware and | |
Starting up | no | software configuration and may vary | |
|
| significantly. | |
|
|
|
Table 1: Calculation of the average task duration