Honeywell UDC 3300 manual Gain PV band over which each Value Gain applies

Models: UDC 3300

1 294
Download 294 pages 16.21 Kb
Page 95
Image 95

Lower Display

Prompt

PVEUVAL1

PVEUVAL2

PVEUVAL3

PVEUVAL4

PVEUVAL5

PVEUVAL6

PVEUVAL7

PVEUVAL8

GAINVAL1

GAINVAL2

GAINVAL3

GAINVAL4

GAINVAL5

GAINVAL6

GAINVAL7

GAINVAL8

Upper Display

Range of Setting

or Selection

PV1 Value for Gain Scheduling

PV2 Value for Gain Scheduling

PV3 Value for Gain Scheduling

PV4 Value for Gain Scheduling

PV5 Value for Gain Scheduling

PV6 Value for Gain Scheduling

PV7 Value for Gain Scheduling

PV8 Value for Gain Scheduling

Gain Value 1 for Gain Scheduling

Gain Value 2 for Gain Scheduling

Gain Value 3 for Gain Scheduling

Gain Value 4 for Gain Scheduling

Gain Value 5 for Gain Scheduling

Gain Value 6 for Gain Scheduling

Gain Value 7 for Gain Scheduling

Gain Value 8 for Gain Scheduling

Parameter

Definition

Gain Scheduling allows you to schedule eight user-defined Gain Values (GAINVALn) applied over eight user-defined PV bands (PVEUVALn).*

PVEUVAL1 is the first PV value to be used in the schedule. Enter a value, in engineering units, that is within the PV limits.

To complete the PV selections for the segments, enter a PV value for all the PVEUVAL prompts listed.

The table on the following page shows the relationship between the GAIN Values and the PVEU Values.

Gain Scheduling prompts are only available when PID SETS in the Control Set Up group is configured for GAIN S.

*Apply to Expanded Model DC330E-XX-X(C or E)X only (requires math option).

GAIN VAL 1 is the first of eight user-defined Gain values.

Enter a Gain Value you want to be used with PVEUVAL n previously entered. Gain values are between 0.001 and 1000 floating.

To complete the Gain selections, enter a Gain value for all the GAINVAL prompts listed.

The table below shows the relationship between the GAIN Values and the PVEU Values.

 

Gain

PV band over which each

 

Value X

Gain applies

 

1

 

Low range limit to PVEUVAL2

 

2

 

PVUEVAL2 to PVEUVAL3

 

3

 

PVUEVAL3 to PVEUVAL4

 

4

 

PVUEVAL4 to PVEUVAL5

 

5

 

PVUEVAL5 to PVEUVAL6

 

6

 

PVUEVAL6 to PVEUVAL7

 

7

 

PVUEVAL7 to PVEUVAL8

 

8

 

PVUEVAL8 to High Range Limit

 

 

 

 

ATTENTION When PB is configured (instead of Gain) in the Control group prompt PBorGAIN, the displayed GAINVALn is in units of %PB. The lower display will still show Gain.

Gain Scheduling prompts are only available when

PID SETS in the Control Set Up group is configured for

GAIN S.

4/00

UDC 3300 Process Controller Product Manual

83

Page 95
Image 95
Honeywell UDC 3300 manual Gain PV band over which each Value Gain applies