Lenovo TD100X manual DIMM air duct, RAID level-5 enabler plug

Models: TD100 TD100X

1 254
Download 254 pages 15.59 Kb
Page 138
Image 138
RAID level-5 enabler plug

The following illustration shows how the cables must be connected when you install the ServeRAID-8k Controller into the simple-swap SATA model.

1

SAS/SATA backplane 1

2

RAID level-5 enabler plug

3

SAS/SATA backplane 2

4

Hot-swap SAS/SATA 1

DIMM air duct

To remove the DIMM air duct, complete the following steps.

1.Read the safety information that begins on page vii, and “Handling static-sensitive devices” on page 75.

2.Turn off the server and peripheral devices, and disconnect the power cords and all external cables necessary to replace the device.

3.Unlock and remove the side cover (see “Removing the side cover” on page 78).

4.Rotate the power-supply cage assembly out of the chassis: v Hot-swap models:

a.Remove the hot-swap power-supply. Press down on the orange release lever and pull the power supply out of the bay, using the handle.

b.Lift up the power-supply cage handle and pull the power-supply cage assembly all the way up until the retainer latch locks the cage in place on the chassis.

vNon-hot-swap models, lift up the power-supply cage handle and pull the power-supply cage assembly all the way up until the retainer latch locks the cage in place on the chassis.

5.Remove the four screws securing the DIMM air duct to the power supply cage.

120ThinkServer TD100 and TD100x: Hardware Maintenance Manual

Page 138
Image 138
Lenovo TD100X manual DIMM air duct, RAID level-5 enabler plug, ThinkServer TD100 and TD100x Hardware Maintenance Manual