5.Press the ServeRAID-8k adapter firmly into the connector.
6.Mount the battery pack to the chassis, using the two mounting screws.
1 | Battery cable | 4 | Battery mounting clips |
2 | Battery | 5 | Battery cable connector |
3 | Battery mounting tabs | 6 | RAID controller |
7.Slide the battery pack mounting tabs into the battery pack mounting clips on the chassis wall
8.Plug the battery pack cable into the connector on the adapter ServeRAID-8 adapter.
9.If you are installing the ServeRAID-8k adapter into a simple-swap SATA model, make the following cabling changes to enable RAID level-5 support:
a.Disconnect the signal cable from the Simple-swap SATA backplate connector on the system board and connector it to the Hot-swap SAS/SATA 1 connector on the system board. See “System-board internal connectors” on page 10 for the location of these connectors on the system board.
118ThinkServer TD100 and TD100x: Hardware Maintenance Manual