Agilent Technologies 1690, 1680 manual Configure the pod under test

Models: 1690 1680

1 174
Download 174 pages 9.17 Kb
Page 109
Image 109
5Configure the pod under test:

Chapter 5: Troubleshooting

General Troubleshooting

eClick the Master button for the clock to be tested; then, select Both Edges.

5Configure the pod under test:

a In the Analyzer Setup dialog, click the Buses/Signals tab b Click Delete All at the bottom of the window.

c Using the mouse, activate all channels for the pod under test. Assign channels to bus/signal name My Bus 1.

d Click on the threshold field for the pod under test. The Threshold Settings dialog appears.

e In the Threshold Settings dialog, select Standard and ECL (-1.30 V).

fClick OK to close the the Threshold Settings dialog.

gClick OK to close the Analyzer Setup dialog.

6Verify the data:

a Click the Listing - Listing 1 tab.

b In the Listing window, click the Manual background Run icon. The display should look

109

Page 109
Image 109
Agilent Technologies 1690, 1680 manual Configure the pod under test