Agilent Technologies E8285A manual Execute Closed Loop Power Control Change, Exec Execution Cond

Models: E8285A

1 464
Download 464 pages 57.8 Kb
Page 251
Image 251

Chapter 4, Description of Fields

Fields

Execute (Closed Loop Power Control Change)

This field allows execution of n-up, n-down, or ramp power-control steps.

GPIB Example

“DISP CTXR;CDMA:PCONtrol:EXECute”

causes the Test Set to output the selected number of steps in the direction selected in the Change field over the power control sub-channel.

Operating Considerations

When Execute is selected, the Test Set will begin sending power-control bits to the mobile station. Each power-control bit attempts to adjust the mobile station’s power level by 1 dB.

See Also

Change field description, on page 193

Steps field description, on page 414

Screens Where Field is Present

CDMA TRANSMITTER POWER RANGE TEST

Exec (Execution Cond)

Selecting this field displays the TESTS (Execution Conditions) screen.

Screens Where Field is Present

TESTS (Main Menu)

Expected

This column in the authentication results table lists Test Set’s computed authentication data for the parameters that are returned from the mobile in the Access Channel Registration, Page Response Message, or Origination Message. The data in the Expected column is compared to the data in the Received column to verify if authentication passes or fails.

See Also

Authen field description, on page 170

Screens Where Field is Present

CDMA AUTHENTICATION

251

Page 251
Image 251
Agilent Technologies E8285A manual Execute Closed Loop Power Control Change, Exec Execution Cond, Expected