Removing and Replacing Line Cards
Checking the Installation of the RP
To verify that the new (or reinstalled) RP is functioning properly, perform the following steps:
Step 1 Verify the following conditions:
•The RP is fully seated and its two captive installation screws are tightened.
•The RP interface cables are connected and secure.
•Any Flash memory cards removed from the old RP are reinstalled in the new RP.
Step 2 Ensure that a console terminal is connected to the console port on the RP and that the console is turned on, or that you are able to accomplish a remote login to the router from another host in the network by means of a telnet session.
Step 3 Check the startup banner and displays to ensure that the system restarts properly and that all the router interfaces reinitialize in the proper state.
Removing and Replacing Line Cards
Procedures for removing and replacing line cards are described in conjunction with the memory upgrade procedures presented in the section entitled “Upgrading Memory on a Line Card.”
Removing and Replacing Switch Cards
This section presents the procedures for removing, installing, and verifying the installation of the CSC and the SFC.
Note The Cisco 12008 supports an online insertion and removal (OIR) feature; thus, you can remove and replace a redundant CSC or any of the SFCs without powering down the system. If you do not have redundant CSCs in your router (that is, your router is equipped with a single CSC), you must power down the system before removing the CSC card.