Installation Tools Required
Cisco 12008 Gigabit Switch Router Installation and Configuration Guide
2-26
Estimate the power budget as follows:
PB = 11.5 dB 11 km (0.5 dB/km) 10 (0.5 dB)
PB = 11.5 dB 5.5 dB 5 dB
PB = 1 dB
The resulting power budget (PB) value of 1 dB indicates that this link would ha ve suf ficient
power for transmission and would not exceed the maximum receiver input power.
Using Statistics to Estimate the Power Budget
Statistical models are more accurate in determining the power budget than worst-case
methods.
Determining the link loss with statistical methods requires accurate knowledge of
variations in the data link components. However, statistical power budget analysis is
beyond the scope of this document.
For further information on this topic, refer to the UNI Forum specifications, ITU-T
standards, and your equipment specifications.
Installation Tools Required
The Cisco12008 can be installed with a minimum number of tools:
1/4-inch flat-blade screwdriver
3/16-inch flat-blade screwdriver
Number 2 Phillips head screwdriver
ESD-preventive wrist strap
Antistatic mat
Tape measure
Level
10-mm wrench (boxed-end, socket, or nut driver)for connecting DC source power
cables to the DC-input power supply terminals