Siemens S5-135U/155U appendix Installation and Startup

Models: S5-135U/155U

1 560
Download 560 pages 1.68 Kb
Page 185
Image 185

CPUs, Memory Cards, Memory Submodules, Interface Submodules

5.4.2Installation and Startup

Jumper Settings

Note

Removing and

Inserting the

Module

!

Insertion

All jumpers on the CPU 928B are required by the manufacturer for quality testing. You must not change the jumper settings.

Caution

Switch off the power supply before removing or inserting the module. The basic board and expansion board of the CPU 928B are one unit and must not be separated.

Proceed as follows to insert the CPU in the central controller:

Step

Action

 

 

1Release the upper locking bar of the central controller and ensure that the locking pin for the module is correctly positioned with the slot-head horizontal.

2Select the correct slot (based on the labelling of the locking bar). Insert the CPUs in the S5-135U/155U from slot 11.

3Push the module evenly into the guide rail until the lever over the locking pin is horizontal.

4Press the locking pin inwards on the bottom of the module and rotate it 90o clockwise.

5Secure the upper locking bar.

System Manual

5-45

C79000-G8576-C199-06

Page 185
Image 185
Siemens S5-135U/155U appendix Installation and Startup