INSTALLATION-DK8 KSU & PCB

SECTION 100-816-204

MARCH 1993

2.20 Mounting the Key Service Unit

1)Make sure the power supply switch is turned OFF.

2)Place the Key Service Unit on the desired location on the mounting surface and mark the location of the four screw holes (there is one on each corner). See Figures 4-1 and 4-2.

NOTE:

Make sure the location of the Key Service Unit meets the minimum clearance require- ments specified in Figure 2-1 in Chapter 2.

3)Drill holes on these marks.

4)Secure screws approximately two thirds of the way into the top two holes on the mounting surface.

5)Hang the unit from the top two screws and then secure the screws completely into the mounting surface.

6)Finish securing the unit to the mounting sur- face by completely screwing the bottom two screws into the wall.

7)Ground system according to Chapter 2, Para- graph 4.

8)Connect applicable wiring (modular CO line cords, 25-pair amphenol connector cable, etc.) to the Key Service Unit. Route the wiring as shown in Figure 4-4, and then fasten wiring to the unit with the tie wraps that come with the Key Service Unit. (See Section 100-816-208, for additional wiring information.)

NOTE:

Figure 4-4 shows cables routed to the right; they may also be routed to the left, depending on the location of the MDF.

9)If the Reserve Power Battery and Charger (HPFB) is going to be installed, refer now to Paragraph 2.30. If not, proceed to Step 10.

10)Plug the AC power cable into an outlet and then turn ON the DC power supply switch.

11)Reinstall the front cover onto the Key Service Unit.

2.30Installing the Reserve Power Battery and Charger (HPFB) (Figure 4-4)

1)Place the HPFU directly above the DK8 KSU.

2)Mark the location of the two screw holes, then drill holes.

3)Screw the two screws two-thirds into the mount- ing surface.

4)Hang the HFPU on the screws then tighten the screws into the mounting surface.

5)Plug the first HPFU connector into BATT con- nector on the right side of the KSU.

6)Connect a ground wire from the HPFB "FG" screw to the DK8 QPSU8 screw labeled "HPFB6." The ground wire can be fed through the opening by the AC power cord (see Figure 4-3).

NOTE:

The DK8 should be plugged into AC power and the DC power switch should be turned on. The HFPU will not start to operate if AC power is not available during the initial instal- lation.

7)The 24V LED on the HPFU should light. If it does not light, press the battery OFF switch with a pencil point or other small-tipped object.

8)Dress and tie-wrap the HPFU cables per Fig- ure 4-4.

9)To mount a second HPFU, repeat steps 1~4, then plug the second HPFU connector in the first HPFU and connect an FG wire between each HPFB FG screw.

10)To test the HPFU, remove the DK8 AC plug from the AC outlet. The DK8 AC LED will go out but the DK8 DC LED remains on, also the system remains in normal working order and the HPFU 24V LED remains on.

11)If it is desired to turn off the HPFU (after loss of AC power), use a pencil or other sharp object to press the Battery Off switch.

CAUTION!

Once the HPFU is turned off or unplugged (During AC power loss) it will not operate again until AC power is restored to the DK8 KSU.

4-4