FIGURE 5-9RESERVE POWER/BATTERY WIRING3 POWER SUPPLY REMOVAL AND
REPLACEMENT
3.00 The power supply (KSPU 16) comes factory-
installed in the Base Key Service Unit (Figure 5-
10); if necessary, it can be removed and replaced.
3.10 Power Supply Removal
1) Make sure that the power supply switch is
OFF and that the AC power cable is not
plugged into an outlet. Confirm that green AC
LED is not lit.
2) Unplug reserve battery cable from BATT con-
nector of power supply (Figure 5-10).
3) Remove K4RCU PCB and Expansion Unit
4) Unplug the DC cable from the DC OUT con-
nector (see Figure 5-10).
5) Remove FG screw from left side of power
ACTUAL
SIZE
PBTC-3M
BATTERY CABLE
WITH RING TERMINALS
AND PPSU CONNECTOR
(LENGTH 9 FEET)
POWER SUPPLY
BATT
TWO-PRONG
MALE CONNECTOR
(PRE-ASSEMBLED)
BLACK
WHITE
IN-LINE
FUSE HOLDER
10 A
(FUSE PROVIDED)
BLACK JUMPER
WITH RING TERMINALS
(PROVIDED)
WHITE
BLACK
12 VDC
BATTERY
+
12 VDC
BATTERY
+
KPSU16
+
RING TERMINALS 3/8 IN.
16AWG
supply to free FG wire/terminal and building
ground wire.
6) Remove the six screws that attach the power
supply to the Base Key Service Unit. Remove
power supply.
3.20 Power Supply Replacement
1) Route FG1 wire (soldered on both sides of
Base Unit motherboard) so it will be under the
power supply inside of standoffs (see Figure
5-10).
2) Set the power supply in its proper place in the
Base Key Service Unit (see Figure 5-9).
3) Secure the power supply to the Base Key
Service Unit with the six screws.