Cross-Connect Actions

System Configuration and Operation

To update a cross-connected circuit from the Cross-Connect Screen, highlight the circuit name to be updated, and press “p” to invoke the uPdate command. Figure 3-26shows the WAN port 1-3 and TS (time slots) 6 through 8 being updated. However if the WANs are selected and deleted as shown in Figure 3-31then the screen in Figure 3-27will be blank for WAN TS 6 through 8.

To delete a cross-connected circuit from the Cross-Connect Screen, highlight the circuit name to be deleted, and press “e” to invoke the dElete command. Figure 3-31shows the deletion process.

Figure 3-31.Delete Cross-Connection Screen