
(22)Catch the Hooks in the order of the arrows and secure the Side cover L with the two bind B M4x12 Taptite screws.
Taptite bind B M4x12
Hook
22d
22a
Side cover L
Front cover
Hooks | Taptite bind B M4x12 |
|
22b
Hooks
22c
Fig.
Confidential |
(22)Catch the Hooks in the order of the arrows and secure the Side cover L with the two bind B M4x12 Taptite screws.
Taptite bind B M4x12
Hook
22d
22a
Side cover L
Front cover
Hooks | Taptite bind B M4x12 |
|
22b
Hooks
22c
Fig.
Confidential |